Power


Civil’s & Construction UK Ltd (CCUL) work in various elements of the power sector, from 400kv, 250kv and 132kv substations through to 66kv wind farm connection substation. Works include earthworks, equipment base construction from CSE (Cable Sealing ends) to small SA (Surge arrester) bases, access roads, below ground drainage and cable troughing, ducting and drawpit construction. Small traditional build and portal frame type buildings to accommodate switchgear. Our workforce are trained in National Grid Persons and BESC allowing works to be carried out on varied sites.